OK, I admit it. This weekend I had a bit of a meltdown. The list of things to get done before the Invaders from the South arrive doesn’t seem be getting any shorter, but the number of available weeks to get it done in definitely is.

My plan for this weekend was perfectly simple. To get the two remaining bathrooms finished. There’s not that much needed – a little bit of tiling to finish. A bit of grouting. And plumb in the toilets. Hardly a weekend’s work, right?

I decided to start with the bath downstairs.

IMG_1375

The bath has been sitting like that, tilted up on its side for months, because when I first tried to plumb it in, it had a leak in the waste pipe underneath. I tried a couple of times to fix it to no avail. So I left it and went on to something more exciting on the principle that if at first you don’t succeed try, try again. If after try, try again you still don’t succeed, ignore the problem and hope that the DIY fairies will somehow magically sort it out when you’re not looking. (Never works – can’t think why.)

Those of you who’ve been following the blog for a while will remember the saga of the bath with the plughole at one end, where my phenomenal lack of organisation resulted in the waste stack coming up through the floor in the wrong place.

The design of the bath means that even if the waste pipe had been put in the right place, it’s a bit of a tight fit. With the stack in the middle of the floor, I’d decided even a shallow waste trap wouldn’t work, so I’d custom made one by buying a flat bottomed bath waste outlet, cutting it in half and adding a bit of extra pipe so it would fit under the cross bar that supported the bath legs.

Easy peasy. Except that when I connected it up, one particular compression joint refused to play ball. No matter how tightly I screwed it, it leaked. Even with what felt like half a mile of PTFE tape wound over the thread and a bucket load of plumbers putty squidged into the joint, still it leaked.

I decided to take it all apart and start again.

Of course, none of this is made any easier when you’re having to play the blind contortionist plumbers game. Ever played that? Try joining two pipes together in a compression joint while lying on the floor on your back with your hands over your head underneath the bottom of a bath, so you can’t see what you’re doing, and trying to work out by feel whether you are turning the joint clockwise or anti-clockwise….. Trust me, it’s a whole lot of fun – not.

And it didn’t work. The pipes were still leaking.

In the end I decided to take the whole section out to see if I could get the offending joint to work, before putting it all back. Another mile of PTFE tape, and the joints tightened as much as I possibly could, I filled it with water and left it.

IMG_1376

Hallelujah – it’s not leaking.

So I put it all back in, playing the blind contortionist plumbers game again, poured a load water down the plughole, stood back and waited, and……it leaked again.

Cue the meltdown. Tears, tantrums and toys well and truly thrown out of the pram. Along the lines of “I hate this house; I’ll never get it finished; I can’t possibly have people to stay while it’s in this state….” You get the picture.

And then I drove down to B&Q and bought another shallow bath trap. One last ditch attempt to make it work before I give up and hang a ‘Display model only, do not use’ sign on the bath when my guests arrive.

But this trap was a slightly different design to the first one. And very slightly shorter. Which meant that if I turned it to one side, there was just about room to put a 90° solvent weld joint, which could then be welded to a length of pipe to reach the waste stack in the middle of the floor. No dodgy compression joints.

In the hope that the divine God of plumbing would look favourably upon my efforts I even drew a smiley face on the pipe, before welding it all together and leaving it overnight to ‘set’.

 

Next morning and the moment of truth. I poured a load of water down the plughole, stood back and waited. And…… that insidious little trickle of water appeared. It was still leaking.

Not, admittedly, on the scale of the puddles of the previous day. But enough to make me want to give up, shut the bathroom door and put up an ‘Out of Order’ sign.

But instead I tilted the bath up again and looked underneath to see where the problem was. All of my welded joints seemed to be dry. As did the compression joint on to the bottom of the bath. The problem seemed to be in the cap that shuts of the access to the trap. Which, it seems, I had forgotten to tighten. Duh!

So I do have a working bath after all. The smiley face worked.

IMG_1387

So that was my weekend. One solitary bath plumbed in. In the grand scheme of the to-do list, just a bit pathetic really.

Fortunately Mum and Dad were there to save the weekend.

While I toddled off to B&Q for my plumbing bits, Mum got on with the grouting. Which is a job I hate!

IMG_1385

So that means that bathroom is practically finished.

And as for Dad – well I’d asked him earlier in the week if he could frame the back wall in the kitchen so we could plasterboard it. Another job I’ve been putting off for a while as I didn’t really know how to go about it.

Neither did my Dad apparently. Rumour has it there was a fair amount of procrastination, head-scratching and general unwillingness to start. Possibly even the odd bit of cursing when he discovered that the wood I’d bought would have been better used making wonky corkscrews.

I’d probably have attempted to use the wood and ended up with a slightly corkscrewed wall. But my Dad, when he does eventually get going, is a perfectionist, so he went out a bought some properly square timber. And proceeded to build a beautifully over-engineered work of art.

It looks like one of those squirrel’s intelligence tests. You know – where you stick a hazelnut in the middle of an assault course and watch to see if the squirrel can work out how to get through it.

He deserves a medal for having created the only truly straight wall in the entire building. It would almost be an act of vandalism to board over it!

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s